Safety inspection points of tower crane of weihai guheng construction machinery co., LTD
1. On-site inspection of tower crane
2. Multi-tower crane distance inspection
3. Distance between tower crane and external wire
4, foundation water
The foundation of the tower crane is immersed in water for a long time, which leads to serious corrosion of the material and welding seam. Or the surface of the welding seam is covered by paint, which leads to the failure of timely detection in the work. Finally, the main material breaks and the welding seam tears, resulting in the collapse of the tower crane.
5. Metal structural parts
(1) the main metal structural parts shall be free from distortion, deformation, crack, serious corrosion of the weld, no obvious appearance defects.
(2) if the corrosion depth reaches 10% of the original thickness without calculation conditions, it shall be scrapped
(3) if the main stressed member produces permanent deformation and cannot be repaired, it shall be scrapped
(4) the main stressed components, such as tower, boom, etc., cannot be repaired after overall instability and must be scrapped.
(5) if cracks occur in structural parts and their welds, the reasons for the cracks should be analyzed, and measures can be taken to strengthen or reapply welding to prevent the development of cracks. If the material does not meet the design requirements, it shall be scrapped.
6. Standard parts of the tower -- main inspection parts
(1) it is strictly prohibited to use standard section instead of foundation section or reinforcement section.
(2) welding on the main chord of standard section, reinforcing section and foundation section is strictly prohibited
(3) the standard section and the pass-over passage of the floor must be solid and safe. Protective railings on both sides shall not be lower than 1.2m, and shall be equipped with footplate or screen enclosure.
7. Spire main limb structure cracking
8. Standard joint bolt -- main inspection site
9. Bolted connection
10. Pin shaft -- main inspection site
The important pin shaft on the tower machine has: lifting arm, balancing arm, standard parts, front and rear pull rod and pull rod and arm etc.
Main causes of pin shaft falling off:
(1) pin shaft channeling shear opening pin causes pin shaft to fall off;
(2) installation without installing or using wire (electrode) to replace the cotter pin;
(3) the pin shaft shall be welded to the structure without pressing plate or opening pin;
(4) the shaft end baffle fastening bolt falls off without spring cushion or long-term vibration due to unstable fastening, and the pin shaft falls off due to the non-action of the platen.
11. Check the tower crane limiter
12. Torque limitation
13. Lifting weight limit
14. Rotary limiter
For the tower crane with no collector in the rotating part, the rotary limiter should be installed. The rotating part of the crane must be able to rotate freely in the non-working state.
15. Broken rope protection
16, environmental
17. Adhesion deformation
18. Wire rope
19. Hook insurance (dead weight type, spring type)
20, pulley
Tower crane pulley main installation parts are: tower top, lifting trolley and hook, etc.
21. Emergency power off switch
86-631-8844968
Mobile web site | WeChat public number |
Weihai guheng construction machinery co. LTD
Address: puji, weihai city, shandong province
Sales hotline: 13863153685 (general manager wang)
Sales hotline: 86-631-8844968
Fax: 86-631-8846789
QQ: 513079487
E-mail:573079487@qq.com
Website: treeoftheworld.com